condensInstallation and ServicingULTIMATE 30cG.C. No. 47-044-48 ULTIMATE 35cG.C. No. 47-044-49
0020167175_01 - 02/13 - Glow-wormINSTALLATIONi IMPORTANT: All the drawings dimensions are shown in mm.6 Appliance location6.1 Location6.1.1 Instructio
0020167175_01 - 02/13 - Glow-worm7 Appliance installation 7.1 Scope of deliveryThe appliance is delivered in a single carton with a document pack and
0020167175_01 - 02/13 - Glow-wormGeneralThis boiler is designed for use as part of a sealed water central heating system with fully pumped circulation
0020167175_01 - 02/13 - Glow-worm7.4 Mounting • Make sure that the equipment used for implementing the installation is compatible with that of the ap
0020167175_01 - 02/13 - Glow-worm7.4.2 Boiler hanginga DANGER: With regards to the Manual Handling Operations, 1992 Regulations, the following lift op
0020167175_01 - 02/13 - Glow-worm8.2 Safety Discharge ValveBA321Key1 Discharge pipe 15mm o.d.2 Pressure relief valve PRV3 Draining outletA PRV outl
0020167175_01 - 02/13 - Glow-wormINCREASE PIPE SIZE 75 mm min.100 mm min.Washing machinetrap / waste442.5INSTALLATION- 14 -
0020167175_01 - 02/13 - Glow-worm9 Evacuation of combustion gas9.1 Regulationb ATTENTION: Only fl ue accessories supplied by Glow-worm must be used.Di
0020167175_01 - 02/13 - Glow-worm9.2 Flue confi guration description9.2.1 Horizontal concentric fl ue Ø 60/100 mm or Ø 80/125 mm (C13 type installation)
0020167175_01 - 02/13 - Glow-worm9.2.3 Multiple boiler chimney fl ueØ 60/100 mm (C43 type installation)b ATTENTION:The fl ue connecting from the applia
0020167175_01 - 02/13 - Glow-worm10.2 Main board1 2 330mmmaxKey1 Connector2 Electrical wires3 Insulation• Keep a distance of a maximum of 30 mm betwe
0020167175_01 - 02/13 - Glow-worm10.4 External accessoriese DANGER: Under no circumstances must any mains voltage be applied to any of the terminals o
0020167175_01 - 02/13 - Glow-worm10.6 Wiring diagram1102113124135146157168179181234109876543211920 18 17 16 15 14 13 12 11MGreen/YellowDMTTNTCEbus24 V
0020167175_01 - 02/13 - Glow-worm11 Commissioning i IMPORTANT:At the time of commissioning, complete all relevant sections of the Benchmark Checklist
0020167175_01 - 02/13 - Glow-worm11.4 Filling DHW Circuit• Open the various hot water taps to fi ll the DHW circuit.11.5 Filling the Condensate Trap
0020167175_01 - 02/13 - Glow-worm11.7 Gas ratesThe supply from the governed meter must be of adequate size to provide a steady inlet working pressure
0020167175_01 - 02/13 - Glow-worm11.9 Testing domestic hot water system• Open a hot-water tap.• Check that the temperature obtained is compliant wi
0020167175_01 - 02/13 - Glow-worm12.2 Installation settings• Push in and hold the button for more than 7 seconds to access the confi guration menu.
0020167175_01 - 02/13 - Glow-wormCode Parameter Unit DescriptionFactory settingModifi able parameterd.44 Digitalized ionisation voltage VDisplay the di
0020167175_01 - 02/13 - Glow-worm12.5 Test modesBy activating these various test modes, you can enable special functions on the appliance.• Press the
INTRODUCTION1 Instructions guidance ...
0020167175_01 - 02/13 - Glow-wormMAINTENANCETo ensure the continued effi cient and safe operation of the boiler it is recommended that it is checked an
0020167175_01 - 02/13 - Glow-worm14.2 Fault memory• This menu allows you to display the 10 most recent failure codes registered by the appliance.• I
0020167175_01 - 02/13 - Glow-wormFault codesDescription Cause SolutionF61Fault in the main boardGas valve command fault• Check the main boards connect
0020167175_01 - 02/13 - Glow-worm14.4 Functional fl ow diagram14.4.1 Central Heating14.4.2 Domestic Hot WaterMAINTENANCE- 31 -
0020167175_01 - 02/13 - Glow-worm15 Gas conversion adjustmentsIn order to adjust the appliance to a diff erent gas that it is set to in production.Thi
0020167175_01 - 02/13 - Glow-worm• Compare the value measured with the values indicated in the table below.Gas adjustment G20 G31CO2 case ON 9 ± 0.2
0020167175_01 - 02/13 - Glow-worm• To obtain service, please call your installer or Glow-worm’s own service organisation.PLEASE NOTE: During routine
0020167175_01 - 02/13 - Glow-worm17.2.2 Control box24V230V1Key1 Control box• Position the control box (1) into the service position.17.3 Combustion c
0020167175_01 - 02/13 - Glow-wormG31 Burner % CO2Model Check (case on) Setting (case off ) CO/CO2 ratio3010.3 ± 0.3% 10.1 ± 0.2% 0.0043510.3 ± 0.3% 10.
0020167175_01 - 02/13 - Glow-worm17.6 Expansion vessel12Key1 Expansion vessel2 Expansion vessel pressure inlet• Check the expansion vessel's su
11 Commissioning ... 2111.1 Rea
0020167175_01 - 02/13 - Glow-worm17.8 Combustion block1011121314151617124356789Legend1 Gas valve connection2 Grounding cable3 Spark electrode inlet4
0020167175_01 - 02/13 - Glow-worm17.8.2 Dismantling the burnerb Warning: The burner door seal (12) must be replaced each time the burner is dismantle
0020167175_01 - 02/13 - Glow-worm18.2 Boiler AccessFor replacement of parts, the front casing panel of the boiler will need to be removed. • To remov
0020167175_01 - 02/13 - Glow-worm18.4 Hydraulic block169108762417131254211819212214152023325272630302829 Key1 Three-way valve2 Three-way valve electr
0020167175_01 - 02/13 - Glow-worm18.4.2 Automatic air vent• Drain the boiler heating circuit as described in the appropriate chapter "Draining&q
0020167175_01 - 02/13 - Glow-worm18.5 Combustion block2019181716151413121121102292325242627288302931327336543433637382351Legend1 Igniter unit retaini
0020167175_01 - 02/13 - Glow-worm18.5.1 Spark electrode• Disconnect the electrode cap (7) and the earthing cable (6).• Remove the 2 spark electrode
0020167175_01 - 02/13 - Glow-worm18.5.9 Gas valve• Remove the burner door (11) refering to chapter "Dismantling the burner door".• Remove
0020167175_01 - 02/13 - Glow-worm18.7.2 2A Fuse Rating• For access, refer to chapter "Main PCB".• The fuse is located at top right hand s
0020167175_01 - 02/13 - Glow-worm• When ordering spare parts, contact Glow-worm’s own service organisation.• Please quote the name of the appliance
0020167175_01 - 02/13 - Glow-wormINTRODUCTION1 Instructions guidance1.1 Product documentationThe instructions are an integral part of the appliance an
Manual HandlingIMPORTANT. With regards to the Manual Handling Operations, 1992 Regu-lations, the following lift operation exceeds the recommended weig
Declaration of ConformityInstallation,Commissioning andService Record
SERVICE INTERVAL RECORDIt is recommended that your heating system is serviced regularly and that you complete the appropriate Service Interval Record
Subject to engineering changesGLOW-WORMNottingham Road, Belper, Derbyshire. DE56 1JTBecause of our constant endeavour for improvement, details may v
0020167175_01 - 02/13 - Glow-worm2.3 Regulation and statutory requirements2.3.1 CE MarkThis boiler meets the requirements of Statutory Instrument, No
0020167175_01 - 02/13 - Glow-worm3 Safety instructions and regulations3.1 Safety instructionsIf the gas pressure at the input of the appliance is out
0020167175_01 - 02/13 - Glow-wormGas SupplyThe gas installation must be in accordance with the relevant standards.In GB, this is BS6891.In IE, this is
0020167175_01 - 02/13 - Glow-wormTECHNICAL DATA5 ULTIMATE cBoiler, type C13, C33, C43Description Unit 30 35Gas category ll2H3Pll2H3PSEDBUK rating 2009
Komentarze do niniejszej Instrukcji